Linkoper - Digital logistics platform for concrete and asphalt plant operations
Industry-Specific Solution

Concrete Delivery Planning Software

Streamline your ready-mix concrete operations with dispatch software that reduces delivery errors by 45% and optimizes your entire fleet.

Includes: Ready-mix concrete software, dispatching, batching, order management, digital ticketing, and customer portal for concrete businesses.

Linkoper concrete delivery planning software with dispatch control and truck tracking
Key Benefits

Intelligent Scheduling for Concrete Deliveries

Our specialized concrete plant software addresses the unique challenges of ready-mix operations with purpose-built tools for scheduling, delivery, and quality control.

Intelligent Scheduling

AI-powered concrete delivery planning software that optimizes truck schedules based on mix requirements, delivery windows, and plant capacity.

Customer Ordering Portal

Online concrete ordering system for customers to place and track their own orders, reducing phone calls and cutting order errors by 45%.

Quality Control

Monitor mix parameters with real-time tracking of slump, temperature, and additives to ensure consistent quality at every job site.

Raw Material Management

Track cement, aggregates, and admixture inventory with automated notifications for reordering to prevent production delays.

Fleet Optimization

Efficiently schedule ready-mix trucks, monitor drum rotations, and provide optimal routes with GPS-enabled tracking for your concrete delivery fleet.

Production Analytics

Comprehensive reporting on plant output, delivery performance, and operational costs to identify optimization opportunities.

Features

Real-Time GPS Tracking & Route Optimization

From production scheduling to quality control and delivery coordination, our concrete plant software provides a comprehensive platform for modern ready-mix operations.

Real-time GPS tracking of concrete delivery trucks
Intelligent scheduling and batch sequencing
Customer self-service ordering portal
Plant efficiency and capacity utilization monitoring
Integration with batching systems and PLCs
Driver mobile app with delivery details and navigation
Automatic alerts for delayed deliveries or quality issues
Electronic ticketing and proof of delivery
Mix design management and version control
Automated customer notifications of delivery status
Comprehensive analytics and business intelligence
Integration with accounting and ERP systems
Linkoper concrete plant software dashboard showing scheduling and dispatch
Industry Challenges

Solving Concrete Industry Challenges

Our concrete delivery planning software tackles the specific pain points that ready-mix producers face in today's competitive market.

Order Accuracy

Phone orders lead to miscommunication about mix designs, delivery times, and job site details, resulting in costly errors and customer dissatisfaction.

Online concrete ordering portal with 45% fewer errors

Scheduling Complexity

Coordinating multiple trucks across changing delivery schedules while balancing plant capacity and customer requirements creates significant logistical challenges.

AI-powered concrete dispatch optimization

Quality Consistency

Maintaining consistent concrete quality across multiple batches, trucks, and delivery distances requires careful monitoring and documentation.

Real-time quality tracking and documentation

Decision Resources

Compare Solutions for Better Decision Making

Explore side-by-side comparisons to understand the benefits of modern concrete management software

Case Study

How a Timing Miscommunication Cost PremiumBuild €42,000

PremiumBuild ordered 120m³ of concrete for a critical foundation pour at a site 1.2 hours away. The dispatcher misunderstood the delivery timing, scheduling all trucks to arrive within one hour instead of spacing deliveries to match the pouring rate. Due to the extended rotation time, approximately 10m³ of concrete in each of the last 2-3 trucks started setting before it could be placed, requiring drum cleaning and replacement of the affected concrete. Total losses: €42,000 in wasted material, cleanup costs, and project delays. After implementing Linkoper's delivery scheduling system with clear timing validation and GPS-tracking, PremiumBuild eliminated such costly timing errors.

€42K
Cost of Error
100%
Error Reduction
60m³
Concrete Saved
Common Questions

Frequently Asked Questions

Get answers to common questions about our ready mix concrete software solutions

Ready to Optimize Your Concrete Plant Operations?

Join the growing community of ready-mix concrete producers who are reducing delivery errors, improving efficiency, and enhancing customer satisfaction with Linkoper's concrete plant software.

30-Day Free Trial
No Credit Card Required
Free Implementation Support
🚀 Early Access Program

Join the early access program. It's FREE!

Transform Concrete and Asphalt operations! Optimize deliveries, streamline plant operations and enhance customer satisfaction.

No credit card required
Setup in minutes
Cancel anytime

Get Started Today

Join 500+ companies already transforming their operations